Swift said the growing sophistication among biotech investor
an opportunity for a more specialist investment fund.
1. Design planning:
• Assess needs and site selection.
• Design the system layout.
2. Get permission:
• Consult local regulations.
• Apply for an installation license.
3. Prepare materials and tools:
• Purchase materials such as photovoltaic panels, inverters, brackets, etc.
• Prepare tools such as the electric drill and screwdriver.
4. Mounting bracket:
• Secure the bracket and adjust the Angle.
5. Install photovoltaic panels:
• Attach the photovoltaic panel to the bracket.
• Connect positive and negative cables.
6. Connect the inverter:
• Install the inverter.
• Connect photovoltaic panel output to inverter.
7. Electrical connection:
• Connect the inverter output to the grid.
• Install circuit breakers.
8. Test system:
• Check all connections.
• Debug system parameters.
9. Acceptance and maintenance:
• Apply for system acceptance.
• Regular maintenance of photovoltaic panels.